ARITERM SWEDEN AB Installation, Operation & Maintenance - 2007.08.14- 1/24INSTALLATION AND OPERATION MAINTENANCE• Biomatic+ 20 and 30
ARITERM SWEDEN AB Installation, Operation & Maintenance - 2007.08.14- 10/24 Boiler cleaningBurning solid fuels, even if operation is automated, n
ARITERM SWEDEN AB Installation, Operation & Maintenance - 2007.08.14- 11/245. Cleaning the burner. Remove the fixing bolts from the burner and lo
ARITERM SWEDEN AB Installation, Operation & Maintenance - 2007.08.14- 12/24 PELLETS FEED SYSTEM• Pellets are feed automatically from the externa
ARITERM SWEDEN AB Installation, Operation & Maintenance - 2007.08.14- 13/24 SAFETY AND ALARMS e boiler is designed according to the same main p
ARITERM SWEDEN AB Installation, Operation & Maintenance - 2007.08.14- 14/24 START-UP IN OFF MODEStart-up in OFF mode (cold burner start with elec
ARITERM SWEDEN AB Installation, Operation & Maintenance - 2007.08.14- 15/24 CONTROL PANEL LAYOUTOn (-Off) Service Reaching the menu level ”Servic
ARITERM SWEDEN AB Installation, Operation & Maintenance - 2007.08.14- 16/24 DISPLAY MESSAGES AND POSSIBLE ADJUSTMENTS e following tables give a
ARITERM SWEDEN AB Installation, Operation & Maintenance - 2007.08.14- 17/24 DISPLAY MESSAGES AND POSSIBLE ADJUSTMENTS Description of menu 2 – Ser
ARITERM SWEDEN AB Installation, Operation & Maintenance - 2007.08.14- 18/24 TROUBLESHOOTINGProblem Check RemedyAll display segments are out.that
ARITERM SWEDEN AB Installation, Operation & Maintenance - 2007.08.14- 19/24 TROUBLESHOOTINGProblem Check RemedyThe device has been stopped during
ARITERM SWEDEN AB Installation, Operation & Maintenance - 2007.08.14- 2/24 CONTENTSImportant Information ...
ARITERM SWEDEN AB Installation, Operation & Maintenance - 2007.08.14- 20/24• Pellet fuel can be manufactured from several diff erent biologically
ARITERM SWEDEN AB Installation, Operation & Maintenance - 2007.08.14- 21/24 ACCESSORIESPellets BoilerPellets storage binATTENTION !max 3 piece fe
ARITERM SWEDEN AB Installation, Operation & Maintenance - 2007.08.14- 22/24Inspection hatch600 x 600 mmStore pipe (delivered by Ariterm),see prev
ARITERM SWEDEN AB Installation, Operation & Maintenance - 2007.08.14- 23/24After installation the burner has to be adjusted. To test every power
ARITERM SWEDEN AB Installation, Operation & Maintenance - 2007.08.14- 24/24Ariterm Sweden AB | Flottilvägen 15 39241 Kalmar Sweden www.ariterm.
ARITERM SWEDEN AB Installation, Operation & Maintenance - 2007.08.14- 3/24 DIMENSIONS / ITEMS INCLUDED IN THE DELIVERY - BIOMATIC+ 20TECHNICAL DA
ARITERM SWEDEN AB Installation, Operation & Maintenance - 2007.08.14- 4/24Part NumberBiomatic+ 30 (part.no. 4009) Standard delivery • Shunt
ARITERM SWEDEN AB Installation, Operation & Maintenance - 2007.08.14- 5/24Biomatic+ 20/30 the new generation pellet boiler is equipped with a 20/
ARITERM SWEDEN AB Installation, Operation & Maintenance - 2007.08.14- 6/24 WIRING DIAGRAM
ARITERM SWEDEN AB Installation, Operation & Maintenance - 2007.08.14- 7/24 e boiler shall be positioned and installed according to the building
ARITERM SWEDEN AB Installation, Operation & Maintenance - 2007.08.14- 8/24Water piping shall be carried out in accordance with current local and
ARITERM SWEDEN AB Installation, Operation & Maintenance - 2007.08.14- 9/24Before you begin heating, the heating system must be fi lled with water.